Presstonic Engineering Limited Logo

Presstonic Engineering Limited

Live Updates, GMP, Subscription Data, and Financial Details

IPO Overview

Listed
Dates Dec 11 - Dec 13,2023
Price Band ₹72
Current GMP ₹140 (94.44%)
Subscription 168.25 times

IPO Details

IPO Date
December 11, 2023 to December 13, 2023
Listing Date
Monday, December 18, 2023
Face Value
₹10 per share
Price
₹72 per share
Lot Size
1600 Shares
Total Issue Size
3,236,800 shares (aggregating up to ₹23.30 Cr)
Fresh Issue
3,236,800 shares (aggregating up to ₹23.30 Cr)
Issue Type
Fixed Price Issue IPO
Listing At
NSE SME
Share holding pre issue
4,470,680
Share holding post issue
7,707,480
Market Maker portion
163,200 shares Nikunj Stock Brokers

IPO Subscription Details

Market Maker
1
Non-Institutional Buyers*
133.56
Retail Investors
188.94
Total **
168.25

Day Wise Sub

DayDay 1 Dec 11, 2023
NII*5.89
Retail27.86
Total16.88
DayDay 2 Dec 12, 2023
NII*21.73
Retail78.16
Total49.96
DayDay 3 Dec 13, 2023
NII*133.56
Retail188.94
Total168.25

Day Wise GMP

Date18-12-2023
Price72.00
GMP72 (100%)
Estimate List Price144
Date17-12-2023
Price72.00
GMP72 (100%)
Estimate List Price144
Date16-12-2023
Price72.00
GMP69 (95.83%)
Estimate List Price141
Date15-12-2023
Price72.00
GMP65 (90.28%)
Estimate List Price137
Date14-12-2023
Price72.00
GMP55 (76.39%)
Estimate List Price127
Date13-12-2023
Price72.00
GMP50 (69.44%)
Estimate List Price122
Date12-12-2023
Price72.00
GMP50 (69.44%)
Estimate List Price122
Date11-12-2023
Price72.00
GMP32 (44.44%)
Estimate List Price104
Date10-12-2023
Price72.00
GMP32 (44.44%)
Estimate List Price104
Date09-12-2023
Price72.00
GMP23 (31.94%)
Estimate List Price95
Date08-12-2023
Price72.00
GMP0 (0%)
Estimate List Price72
Date07-12-2023
Price72.00
GMP0 (0%)
Estimate List Price72

IPO Important Dates

IPO Open Date
Monday, December 11, 2023
IPO Close Date
Wednesday, December 13, 2023
Basis of Allotment
Thursday, December 14, 2023
Initiation of Refunds
Friday, December 15, 2023
Credit of Shares to Demat
Friday, December 15, 2023
Listing Date
Monday, December 18, 2023
Cut-off time for UPI mandate confirmation
5 PM on December 13, 2023

IPO Lot Size

ApplicationRetail (Min)
Lots1
Shares1600
Amount₹115,200
ApplicationRetail (Max)
Lots1
Shares1600
Amount₹115,200
ApplicationHNI (Min)
Lots2
Shares3,200
Amount₹230,400

Financial Information

Period EndedPeriod Ended
30 Sep 202330 Sep 2023
31 Mar 202331 Mar 2023
31 Mar 202231 Mar 2022
Period EndedAssets
30 Sep 20232,850.69
31 Mar 20232,737.68
31 Mar 20222,496.71
Period EndedRevenue
30 Sep 20231,431.67
31 Mar 20232,113.27
31 Mar 20221,272.21
Period EndedProfit After Tax
30 Sep 2023152.21
31 Mar 2023256.14
31 Mar 202214.06
Period EndedNet Worth
30 Sep 2023645.57
31 Mar 2023493.36
31 Mar 2022237.22
Period EndedReserves and Surplus
30 Sep 2023198.50
31 Mar 2023269.83
31 Mar 202213.69
Period EndedTotal Borrowing
30 Sep 20231,536.97
31 Mar 20231,645.27
31 Mar 20221,797.08

Key Performance Indicator

P/E (x)
6.28
Post P/E (x)
18.23
Market Cap (₹ Cr.)
55.49
ROE
115%
ROCE
87%
Debt/Equity
0.98
EPS (Rs)
5.73

IPO Reservation

Anchor Investor Shares Offered
-
Market Maker Shares Offered
163,200 (5.04%)
Other Shares Offered
1,537,600 (47.50%)
Retail Shares Offered
1,536,000 (47.45%)
Total Shares Offered
3,236,800 (100%)

Information about company

Incorporated in 1996, Presstonic Engineering Limited manufactures products for Metro Rail Rolling Stock, Metro Rail Signalling and Infrastructure. Presstonic Engineering manufactures Metro Rail Rolling Stock Products, Metro Rail Signalling Products, and Infrastructure Products for global and domestic OEMs engaged in the manufacture and maintenance of rail and metro rail rolling stock and signaling equipment. The company's product portfolio includes: Metro Rail Rolling Stock Products: Rolling Stock Interior Products: Saloon Bucket/Plain Type Seat, Custom Colored Engineered Handles, Grab Pole System, Hand Rail System, Emergency Evacuation Ramp, Honeycomb Partition Panels, etc. Rolling Stock Non-Interior Products: Aluminum Cable Management Systems, Cab Handrail, Under Carriage Frame Module, Air Handling Unit, Battery Box, Equipment Mounting Frames, Gangway Frame, Driver Foot Rest Assembly, Enclosure Box, Driver Simulator Cabin, etc. Metro Rail Signaling Products: IP Rated Enclosures, Beacon Mounting Brackets, Ballastless Support Bracket, DCS Mast, Ladder Assembly with DCS Mast Platform, etc. Infrastructure Products: Steel Structure and Aluminum Murals, Support Structure for Solar Panels, Wire Form and Cable Trays, etc. The company's manufacturing facility is located in Viswaneedam, Bangalore, and is spread over 28,317.50 sq. ft.

Disclaimer

All matter published here is purely for educational and information purposes only and under no circumstances should be used for making investment decisions. We are not a SEBI Registered analyst. Readers must consult a qualified financial advisor prior to making any actual investment decisions, based on Information published on this application. No financial information whatsoever published anywhere, within this application, should be considered as advice to buy or sell securities or invest in IPOs, or as a guide to doing so in any way whatsoever Please read all Tearms and conditions , and agree to use the App